August 23, 2007
















Looking good!





The basement concrete is in! God Bless you men and especially the one who did the hard work of the finishing!





The mudding and taping is done upstairs!





August 15th, 2007






















































































































The drywall is coming along. The jacuzzi tub is in and being plumbed. The deck siding is being finished. We still have some front siding to complete. The basement concrete is planned for Monday and then we will be able to install the basement windows. Things are moving along. Great Job Folks! GBY














Saturday August 11, 2007

Blessed are those whose strength is in you, who have set their hearts on pilgrimage.
As they pass through the Valley of Baca, they make it a place of springs; the autumn rains also cover it with pools. They go from strength to strength, till each appears before God in Zion.
psl 84:6-7

The last week of July, now into August...



Well, it is coming along! Got all the siding done, except a bit on the rock facing at the front.


The inside is quickly becoming covered with vapor barrier, insulation and drywall. The plumbing is almost done in the basement so the floor can be poured soon. Things are looking great! Slow, but steady. God Bless you guys!